Call 01473 824480 or email enquiries@uiprojects.com for more information
We are experienced providers of out-sourced engineering services to the power (distribution and transmission), telecoms and water industry sectors, with an enviable track record for reliability, safety, quality and value for money.
We have worked with a range of clients throughout our history, and can manage and work on projects both around the UK and internationally. If you have any questions about a specific project in our portfolio, please contact our team for more information.
Utility Installation Projects worked with Coldham Solar Farm to install dual 11kV circuits and fibre optic infrastructure spanning approximately 2km across varied terrain.
Utility Installation Projects worked with Norwich University of the Arts to connect the Old Barclays Bank building to the existing fibre network powering the University.
Utility Installation Projects worked on behalf of East Solutions to install additional power sources to TOMWORLD, in the form of new substation connections.
Utility Installation Projects worked with UKPN on a 132kV network reinforcement scheme to cater for import capacity from Sheringham Windfarm.
Utility Installation Projects worked with EDF Energy to install cabling and ducting over a 2.3km route between substations in Peterborough.
Utility Installation Projects worked with McAlpine to excavate and install 33kV cables, associated pilot cables, and one oil line through a public highway and sub station land.
Utility Installation Projects worked with EDF Energy to install an emergency additional 132kV supply serving the Rayleigh / Southend-on-Sea area over a length of 2 km.
Utility Installation Projects worked with VolkerInfra to provide engineering consultancy and supervision of the on-shore section of sub-marine cable connection.
Utility Installation Projects worked with UKPN to install concrete foundation bases for steel ODSE structures as part of an £8.5 million project.
Speak to our customer support team: 01473 824480
Utility Installation Projects worked with Coldham Solar Farm to install dual 11kV circuits and fibre optic infrastructure spanning approximately 2km across varied terrain.
Utility Installation Projects worked with Norwich University of the Arts to connect the Old Barclays Bank building to the existing fibre network powering the University.
Utility Installation Projects worked on behalf of East Solutions to install additional power sources to TOMWORLD, in the form of new substation connections.
© 2025 UIP | A Mackman Group collaboration – market research by Mackman Research | website design by Mackman