Client: AMIS/EDF Energy
Contract Value: £2.5m
Scope of Works: Installation of emtelle ducts and cable over a 2.3km route, in the highway, between Peterborough Central and Peterborough South grid substations.
- Installation of 2 blocks of 160mm Emtelle ducts, in trefoil, for 132kV circuits, plus pilot duct (500mm circuit separation).
- Installation of 4 x 630Al, 33kV circuits in 200mm duct, plus pilots, single trench.
- Cable pulling / joint bay excavation & reinstatement.
- Traffic management and Nene Valley rail crossing.