Call 01473 824480 or email enquiries@uiprojects.com for more information

Peterborough 132kV & 33kV Reinforcement

Utility Installation Projects worked with EDF Energy to install cabling and ducting over a 2.3km route between substations in Peterborough.

Client: AMIS/EDF Energy

Contract Value: £2.5m

Scope of Works: Installation of emtelle ducts and cable over a 2.3km route, in the highway, between Peterborough Central and Peterborough South grid substations.

  • Installation of 2 blocks of 160mm Emtelle ducts, in trefoil, for 132kV circuits, plus pilot duct (500mm circuit separation).
  • Installation of 4 x 630Al, 33kV circuits in 200mm duct, plus pilots, single trench.
  • Cable pulling / joint bay excavation & reinstatement.
  • Traffic management and Nene Valley rail crossing.

For more information on this project and UIP’s capabilities, speak to a member of our team or email enquiries@uiprojects.com.