Scroby Sands Wind Farm, Great Yarmouth

Replacement of failed High Voltage cables from offshore wind turbines on beach.

These works involved the excavation of trenches for each circuit along the beach, excavation on to live cables for testing and cable pulling off a marine cable frame ship, along the beach to the land cable, maintain joint bays. Installation of Anchors for boat and excavation of beach for boat plough to install marine cable under sea bed.

Client: Vestas Offshore Ltd

Contract Value: £250k

Services Supplied: Excavation works, labour to assist other works, supervision, plant and materials for works and site facilities