Client: Vestas Offshore Ltd
Contract Value: £250k
Services Supplied: Trench excavation works, labour to assist other works, supervision, plant and materials for works and site facilities
Replacement of failed High Voltage cables from offshore wind turbines on beach.
These works involved trench excavation for each circuit along the beach, excavation on to live cables for testing and cable pulling off a marine cable frame ship, along the beach to the land cable, maintaining joint bays. Installation of anchors for boat and excavation of beach for boat plough to install marine cable under sea bed.