Client: Spice Plc Contract Value: £350k Services Provided: Install 6km 11kV triplex in cable basement Pulling into place and cleating new HV cables onto cable racking . Excavate & lay HV cables and associated civil ...Arbury Grid
Client: McAlpine Contract Value: £320k Services Provided: Install 6km 11kV triplex in cable basement Installing HV cables within sub-station and highway. Excavation works, cable pulling , scaffold erection in 132kV towers. Installing 132kV/33kV/11kV and LV in duct ...Great Wheatley Road, Rayleigh
Installation of 132kV Cable to support network infrastructure. Emergency work to install an additional 132kV supply serving the Rayleigh / Southend-on-Sea area over a length of approx 2 km. Work ...Rose Valley Substation, Brentwood
Excavate and install 33kV cables with associated Pilot Cables and one oil line through the public highway and Sub Station land. Renewal of existing oil filled cables over a distance of ...Scroby Sands Wind Farm, Great Yarmouth
Replacement of failed High Voltage cables from offshore wind turbines on beach. These works involved the excavation of trenches for each circuit along the beach, excavation on to live cables for ...
Electricity & Telecoms Network Installations
Great Wheatley Road, Rayleigh

Installation of 132kV Cable to support network infrastructure. Emergency work to install an additional 132kV supply serving the Rayleigh / Southend-on-Sea area over a length …
Rose Valley Substation, Brentwood

Excavate and install 33kV cables with associated Pilot Cables and one oil line through the public highway and Sub Station land.