Dubai Palm Island

Client: Volkerinfra

Contract Value: £300k

Services provided: Provision of engineering consultancy and supervision of onshore section of sub-marine cable connection . Much of the cable installation was undertaken overnight to avoid over-heating of machinery during daytime ambient temperatures of 40 deg C.

  • Installation of 132kV DC cables.
  • Cables pulled via pre-installed directional drill between islands
  • 80t cable drums floated into position on pontoon barges
  • Cable installed with the aid of electrically powered push-pull machines